Packs to apply to be an Approved Contractor for the Hillcrest Group are available now.
Contractors can download a pack by clicking the links below:
Right to Repair timescale for reactive repairs
The deadline for completed packs to be returned is 5pm, Friday 16 March 2018.
Please note we are only considering applications from the following trades:
Joinery, plumbing, gas engineers, electrician, locksmith, drainage, plastering/roughcasting, general building & repair works including bricklaying, hard & soft landscaping, white goods repairs, tiling, scaffolding, painting & decorating, rope access, TV aerials, floor coverings, glazier, specialist window & door repairs, suspended ceilings, blacksmiths, general cleaning, upholstery, worktop resurfacing & enamels trades.